The House of Checklists is provided as an information resource for
non-sports card collectors. The lists are not an offer to sell or
to buy. Please click on the image above to visit the main page.
Construction of Railway Trains Ogden's Cigarettes - 1930 Reprinted 1999 - Card Collectors Society
Notes: Cards are approximately 1-3/8" x 2-5/8". Many thanks to Kyle DeRoy for the original checklist!
No. Title 1 Raw Steel in the Cogging Mill 2 In the Brass Foundry 3 Cutting Frames 4 Machining 16 Frame Plates 5 Setting up Frames 6 Drilling Frames for Cylinder Bolts 7 Casting Cylinders 8 Planing the Cylinder Block 9 Boring the Piston Valve Chambers 10 Drilling the Cylinder Casting 11 Setting up Cylinders 12 Turning the Crank Axle 13 Turning the Piston Rod 14 Turning Piston Valve Rings 15 The Flanging Press and Gas Furnace 16 Vertical Plate Rolls 17 Riveting the Firebox 18 Shaping the Boiler Plate 19 Riveting the Boiler Shell 20 The Boiler Fitted 21 "White Jacket" - the Boiler Clothed 22 Fitting Motion Parts 23 The Smokebox Fitted 24 Shaping the Dome Casing with Pneumatic Hammer 25 Fitting Tanks 26 Forging a Coupling Rod 27 Milling Coupling Rods 28 Forming Laminated Spring Plates 29 Pressing Driving Wheels on Axle 30 Boring the Wheel Tyre for Shrinking 31 Heating Tyre for Shrinking 32 The Driving Wheels in the Lathe 33 Balancing Driving Wheels 34 Burnishing Journals 35 Wheeling 36 Engine Lifted to run in the Bogie 37 Band-Sawing Oak Logs for Wagons 38 Cropping Steel Channel 39 Erecting Steel Wagon Underframe 40 Drilling Wagon Headstocks 41 Building 12-ton Wagons by Mass-Production 42 Final Touches: Lettering Wagons 43 Assembling Floor Framing 44 Assembling Ends of Passenger Coaches 45 Fixing Frames of Coach 46 Cramping & Screwing Quarters 47 Assembling Coach Roof on Jig 48 Upholstering Seat Backs 49 Assembling & Screwing Carriage Door 50 Coats of Paint: Teak-Graining©2001, 2002 Kyle DeRoy, Jeff Allender. Comments, updates, & corrections are welcomed!